The Environmental Permitting Section administers the Joint Coastal Permit
(JCP) program, but not the Coastal Construction Control Line program. This Section also regulates navigational dredging of deepwater ports and inlets under the
Environmental Resource Permit (ERP) program or, if located in the panhandle, the
Wetland Resource Permit (WRP) program. Through these programs, the Environmental Permitting Section reviews permit applications to make sure that any potential adverse impacts of the proposed projects have been avoided or minimized. Once a permit has been issued, the Section monitors the progress of the project to confirm that there have been no unacceptable impacts.
Joint Coastal Permitting
On October 13, 1995, the Department of Environmental Protection implemented section 161.055, of the Florida Statutes, initiating concurrent processing of applications for coastal construction permits, environmental resource permits, wetland resource (dredge and fill) permits, and sovereign submerged lands authorizations. These permits and authorizations, which were previously issued separately and by different state agencies, have now been consolidated into a
"joint coastal permit" or JCP. The consolidation of these programs and the assignment of responsibility to a single bureau (DEP’s Bureau of Beaches and Coastal Systems) has eliminated the potential for conflict between permitting agencies and helped ensure that reviews are conducted in a timely manner. A copy of the permit application is forwarded to the United States Army Corps of Engineers for separate processing of the federal dredge and fill permit, if necessary.
A JCP is required for activities that meet all of the following criteria:
- Located on Florida’s natural sandy beaches facing the Atlantic Ocean, the Gulf of Mexico, the Straits of Florida or associated inlets;
- Activities that extend seaward of the mean high water line;
- Activities that extend into sovereign submerged lands; and
- Activities that are likely to affect the distribution of sand along the beach.
Activities that require a JCP include beach restoration or nourishment; construction of erosion control structures such as groins and breakwaters; public fishing piers; maintenance of inlets and inlet-related structures; and dredging of navigation channels that include disposal of dredged material onto the beach or in the nearshore area.
Beach restoration and nourishment have been the main methods of managing beach erosion and maintaining beach habitat. However, the Bureau of Beaches and Coastal Systems also evaluates innovative technologies that might be more effective, less costly and less likely to cause adverse impacts. Applicants wishing to test a new technology (as an experimental JCP) are encouraged to schedule a pre-application consultation with Bureau staff to see if similar methods have already been tested, consider adverse impacts and discuss the theoretical potential to solve an erosion problem. Experimental projects require a reliable experimental test plan to determine the success or failure of the technology.
Back
to top of page
Environmental Resource Permitting
The Environmental Permitting Section also implements a portion of the Environmental Resource Permit (ERP) program (or the Wetland Resource Permit program in the panhandle) for navigational dredging of deepwater ports and inlets.
The ERP program ensures that such construction activities do not degrade water quality (such as through the loss of wetlands, improper in-water construction techniques, or discharge of inadequately treated water from dredged material disposal sites), or damage marine resources (including corals, seagrasses, mangroves or habitat for manatees or marine turtles).
View ERP and WRP application forms
In addition to the regulatory (permit) programs discussed above, permission to use sovereign (state-owned) submerged lands is also addressed in the review process. The application for proprietary authorization to use these lands, in the form of a letter of consent, easement or lease, is reviewed and granted (or denied) at the same time the JCP, ERP or WRP application is reviewed and issued (or denied).
The processing procedures and criteria for issuance of a JCP, ERP and WRP are found in the following statutes and the rules adopted
thereunder:
Back
to top of page
Environmental Permitting Section Staff:
|
Martin
Seeling |
(850) 414-7728 |
Environmental
Administrator |
|
Matthew Mask |
(850) 414-7731 |
Staff Assistant (Maintains
Joint Coastal Permit web
page |
|
Vladimir
Kosmynin |
(850) 414-7817 |
Biological Evaluation and Monitoring (Coral
Expert) |
|
Cheryl Miller |
N/A |
Biological Evaluation and
Monitoring (Seagrass Expert) |
|
Steve MacLeod |
(850) 414-7806 |
Environmental Manager
Supervising Ports and Beach Projects in Southeast Florida |
|
Michael
Carothers |
(850) 413-7765 |
Permitting, Compliance and
Enforcement for Navigational Dredging of Deepwater Ports |
|
Merrie Beth Neely |
(850) 413-7798 |
JCP Processor for Beach Projects in
Southeast Florida |
|
Caitlin Lustic |
(850) 413-7766 |
Permit Processor for
Miscellaneous Beach and Port Projects |
|
Lainie Edwards |
(850) 414-7796 |
Environmental Manager
Supervising Beach Projects in North and Southwest Florida |
|
Jamie
Christoff |
(850) 414-7756 |
JCP Processor for Beach Projects in
North Florida and Public Fishing Piers Statewide |
|
Molly Edson |
(850) 413-7785 |
JCP Processor for Beach
Projects in Southwest |
|
Lizbeth
Childs |
N/A |
Contractor (Miscellaneous Beach Projects) |
|
Jim Martinello |
(850) 414-7772 |
Environmental Manager
Supervising
Compliance and Enforcement |
|
Kris Christie |
(850) 414-7790 |
CCCL Compliance |
|
Earlene Wilson |
(850) 414-7744 |
CCCL Enforcement |
|
Charlotte Hand |
(850) 414-7716 |
JCP Compliance Officer |