Brief History of Lake OkeechobeeGeological survey data indicate that Lake Okeechobee was formed about 6,000 years ago, when ocean waters receded and water was left standing in a shallow depression in what today is known as the state of Florida. The expansive lake that resulted from this process was named Okeechobee, which means "big water" in the Seminole Tribe language. The lake was a direct source of water to the Everglades, by way of numerous small tributaries passing out of the lake’s southern end. Changes in South Florida have had severe impacts on Lake Okeechobee. In the 1890s, Hamilton Disston, a Philadelphia businessman and real estate developer, constructed a canal connecting Lake Okeechobee with Lake Hicpochee, the headwaters of the Caloosahatchee River, providing the lake’s first outlet to tidewater via the Caloosahatchee River. In the early 1900s, the Everglades Drainage District constructed several other canals that impacted Lake Okeechobee. These canals provided a slow, continuous drainage from Lake Okeechobee and the Everglades. The goal was to drain the northern Everglades for agriculture to prevent the crops from flooding. Small towns arose in this region, some very close to the lake. A
small muck levee was constructed along the southern shore of the
lake to protect those towns and farms. But then, in the 1920s two
major hurricanes struck south Florida. One of them generated a storm
surge in the lake that flooded coastal areas and hundreds of acres
to the south and killed approximately two thousand people. To
prevent this kind of devastation from recurring, the state asked
Congress for help. Congress directed the United States Army Corps of
Engineers (USACE) to
lead efforts to prevent future tragedies of that scale. Building the
Herbert Hoover Dike
At the same time the dike and water control structures were completed, the USACE developed a water level management tool, called a regulation schedule, that is cooperatively administered by the USACE and South Florida Water Management District (SFWMD). High water levels can led to declines in the lake's submerged plant beds and in the juvenile ages classes of important sport fish (such as bass). When lake levels are particularly high, large flood control discharges of freshwater are sent though canals to the St. Lucie and Caloosahatchee estuaries, impacting the estuarine organisms. After construction of canals, much of the land around Lake Okeechobee was converted to agricultural use. To the north, dairy farms and beef cattle ranching became the major land uses, while in the south, sugar cane and vegetable farming increased rapidly. Associated with the land use changes were large increases in the rate of nutrient (nitrogen and phosphorus) inputs to the lake, leading to water quality challenges. The PlansIn 2000, the Florida State legislature passed the Lake Okeechobee Protection Act. Through the legislation, the SFWMD, the Florida Department of Agriculture and Consumer Services (DACS), and the Florida Department of Environmental Protection (DEP) have developed and implemented strategies to restore the lake and its watershed.
Announced in October 2005, Lake Okeechobee & Estuary Recovery (LOER) plan is a response to the current conditions of Lake Okeechobee and the St. Lucie and Caloosahatchee Estuaries after the 2004-2005 hurricanes. This action plan has been developed to help restore the ecological health of these water bodies, building on the strategies identified in the Lake Okeechobee Protection Plan.
|
Quick Links:
|
Last reviewed: June 19, 2008