Programs
Northwest District Home
Administrative Services
Air Resources
Ecosystem Restoration
Submerged Lands Environmental Resources
Water Resources
Watershed Management
Waste Management
Information
Choctawhatchee Bay Water Quality
Clean Marina Program
Emergency Response
Northwest District Parks
Pollution Prevention
Project Greenshores
Water Quality Outlook
Last updated: May 11, 2005
Ecosystem Management Agreement (EMA) with the St. Joe Company
Devi's Swamp Mitigation Bank Exhibits Location and Service Area Map Aerial Photo, 1999 Quad Topographic Map Soils Map Existing Land Use and Land Cover Proposed Land Use and Land Cover Phases, Hydrologic Improvements and Locations Historic Aerial Photo, 1949 Turbidity Curtain Diagram Mitigation Bank Map Existing Land Use Migitgation Bank Map Proposed Land Use Hydrological Report Hydrological Restoration Report (TOC) Hydrological Restoration Plan Cover Page Hydrological Exhibits Devil's Swamp Mitigation Bank Location Map Existing Conditions Survey Data Survey Data Enlarged Views Quad Topographic Map Soils Map 100 Year Flood Plan Map Pre-Condition Drainage Flows Post-Condition Drainage Flows (Nodal Diagram) Primary Stormwater System Model Schematic Proposed Improvements-Locations New Culvert Installation Details Typical Low Water Crossing Diagram Post-Condition Drainage Flows Post-Condition Drainage Flows (Cont.) Post-Condition Drainage Flows (Cont.) Permit Attachments Mitigation Plan Documentation (TOC) Mitigation Area-Burn Units Mitigaqtion Bank Implementation Costs Perpetual Management Costs Area Boundaries For more information, return to St. Joe Company Projects Information
Devi's Swamp Mitigation Bank
Exhibits
Location and Service Area Map Aerial Photo, 1999
Quad Topographic Map
Soils Map
Existing Land Use and Land Cover
Proposed Land Use and Land Cover
Phases, Hydrologic Improvements and Locations
Historic Aerial Photo, 1949
Turbidity Curtain Diagram
Mitigation Bank Map Existing Land Use
Migitgation Bank Map Proposed Land Use
Hydrological Report
Hydrological Restoration Report (TOC)
Hydrological Restoration Plan Cover Page
Hydrological Exhibits
Devil's Swamp Mitigation Bank Location Map
Existing Conditions Survey Data
Survey Data Enlarged Views
100 Year Flood Plan Map
Pre-Condition Drainage Flows
Post-Condition Drainage Flows (Nodal Diagram)
Primary Stormwater System Model Schematic
Proposed Improvements-Locations
New Culvert Installation Details
Typical Low Water Crossing Diagram
Post-Condition Drainage Flows
Post-Condition Drainage Flows (Cont.)
Permit Attachments
Mitigation Plan Documentation (TOC)
Mitigation Area-Burn Units
Mitigaqtion Bank Implementation Costs
Perpetual Management Costs
Area Boundaries
For more information, return to St. Joe Company Projects Information