  • Power Plants                        

Fuel type


 

1. Florida Power & Light Bobwhite-Manatee

 

 Manatee and Sarasota Counties
2. Progress Energy/Tampa Electric Lake Agnes - Gifford

 

 Polk, Orange and Osceola Counties

 




Meet Florida's Siting Board ("Board" means the Governor and Cabinet sitting as the Siting Board)

Please note that the schedules given below can be altered according to s. 403.5095, F.S., which states, "Any time limitation in this act may be altered by the designated administrative law judge upon stipulation between the department and the applicant, unless objected to by any party within 5 days after notice, or for good cause shown by any party."


 

Power Plant Applications in Process


 

coal burning

 

Coal

 

 

 

 

1.     SECI -Seminole Unit 3 (PA78-10A2)- 750 MW pulverized coal unit on an existing facility in Putnam County

DEP Siting Coordination Case Manager - Ann Seiler (850) 245-8008

DOAH Docket

 

 PSC Docket

 

Applicant (SECI)

 

Putnam County

 


 

electron width for Nuclear

 

Nuclear

 

 

 

                                

 

1.  Progress Energy Crystal River Nuclear Unit No. 3  (PA77- 09A2)
 -  increase generation capacity at the nuclear unit by 180 MW.

 

DEP Siting Coordination Case Manager - Cindy Mulkey (850) 245-8006

DOAH Docket

PSC Docket

Applicant

Citrus County

 


 

2.  Florida Power & Light St. Lucie Uprating  (PA74- 02A2) -  uprating the two nuclear units (#1 and #2) at St. Lucie for additional capacity output of approximately 100 MW each.

 

DEP Siting Coordination Case Manager - Cindy Mulkey (850) 245-8006

DOAH Docket

PSC Docket

Applicant 

St. Lucie County

 

 


 

3.  Florida Power & Light Turkey Point Uprating  (PA03- 45A2) - uprating the two nuclear units (#3 and #4) at Turkey Point for additional capacity output of approximately 100 MW each.

 

DEP Siting Coordination Case Manager - Cindy Mulkey (850) 245-8006

DOAH Docket

PSC Docket

Applicant 

Miami-Dade County


 

4. Progress Energy Levy County Nuclear   (PA08- 51) - New nuclear plant consisting of two 1100 MW units to be built in Levy County with approximately 188 miles of associated transmission line.

DEP Siting Coordination Case Manager - Nuclear Plant- Cindy Mulkey (850) 245-8006

DEP Siting Coordination Case Manager - Transmission Line - Ann Seiler (850) 245-8008 

DOAH Docket

PSC Docket

NRC

Applicant 

Interactive Map

Community Partnership

Project Maps

     


 

gas burner

 

Gas

 

 

 

        

 

1. FPL West County Expansion - Unit 3     (05-47SA1)     - approximate 1600 MW expansion of its existing 2200 MW West County power plant located in Palm Beach County.                          

DEP Siting Coordination Case Manager - Mike Halpin (850) 245-8005

DOAH Docket

PSC Docket

Applicant

Palm Beach County

 


 

2. FMPA/KUA Cane Island - Unit 4     (98-38A2)     - an approximate 300 MW expansion of the existing 410 MW (nominal) Cane Island power plant located in Osceola County.                          

DEP Siting Coordination Case Manager - Mike Halpin (850) 245-8005

 

DOAH Docket

PSC Docket

Applicant

Osceola County

 


 

 

oil rig

 

Oil                   None at this time 

 

 

 

         



 

Transmission Line Applications in Process

 

transmission line

1. FP&L Bobwhite-Manatee 230kV Line (TA07-14) -  Proposed 25.5 mile long line to connect the Manatee Energy Center near Parrish in Manatee County to a proposed new substation east of I-75 in Sarasota County.

DEP Siting Coordination Case Manager - Ann Seiler (850) 245-8008

 

DOAH Docket

PSC Docket

Applicant (FPL)

Manatee County

Sarasota County

 

 


 

2.  Progress Energy/Tampa Electric Lake Agnes - Gifford 230kV Line  (TA07-16) Proposed 27.5 mile line connecting TECo' existing Lake Agnes substation in Polk County to PEF's planned Gifford Substation in Orange County (substations are not part of the certification).

 

DEP Siting Coordination Case Manager - Ann Seiler (850) 245-8008

 

DOAH Docket PSC Docket Applicants (PEF and TECo) Polk County Osceola County Orange County
Published in
  • The Ledger, Lakeland, FL
  • The Orlando Sentinel, Orlando, FL

 

 


Natural Gas Pipeline Applications in Process

natural gas pipeline

 

 

None at this time

 

 

 

 

 

 

 




Information on Future Projects
(no applications have been received)

 

JEA Greenfield Energy Center                                                                                            Applicant     

FPL Nuclear Plant  - Turkey Point Units 6 & 7                          PSC Docket       NRC           Applicant

FPL Cape Canaveral Next Generation Clean Energy Center   PSC Docket                        Applicant

FPL Riviera Beach Next Generation Clean Energy Center      PSC Docket                        Applicant

Peninsula Pipeline                                                                  PSC Docket                        Applicant

 

 

 

 

NEW

 

Last updated: August 28, 2008

  2600 Blair Stone Rd M.S. 48   Tallahassee, Florida 32399   850-245-8002 (phone) /  850-245-8003 (fax)
 