|
Environmental
Resource Permitting Rules |
|
Chapter |
Title |
Effective |
|
62-4 (169K) |
Permits |
10/01/07 |
|
62-113 (31k) |
Delegations |
07/16/01 |
|
62-301
(69k) |
Surface Waters of the State |
01/08/96 |
|
62-302 (115K) |
Surface
Water Quality Standards
|
04/04/02 |
|
62-302.530 (47K) |
Table: Criteria for Surface Water
Quality Classifications
|
04/04/02 |
|
62-330 (19K) |
Environmental
Resource Permitting |
12/05/05 |
|
62-340 (100K) |
Delineation
of the Landward Extent of Wetlands and Surface
Waters |
05/09/00 |
|
62-341 (103K)
Trafficshed
Map |
Noticed
General Environmental Resource Permits |
02/22/07 |
|
|
TP-83, A Regional Waterway Systems Management Strategy
for Southwest Florida, 1996 |
|
|
|
TD-1, South Sarasota County, 2000 |
|
|
|
TD-2, North Manatee County, 1999 |
|
|
|
TD-3, Lee County, Phase 1, 2000 |
|
|
|
TD-4, Lee County, Phase 2, 2001 |
|
|
|
TD-5, Lee County, Phase 3, 2002 |
|
|
|
TD-6, Bishop Harbor, Tidal Braden River, and Lower
Reaches of the Upper Manatee River, 2002 |
|
|
62-342 (10.5K) |
Mitigation Banks |
05/21/01 |
|
62-343 (57K)
|
Environmental
Resource Permit Procedures (Forms) |
02/19/03 |
|
62-343.900(1) (160K) |
ERP
Joint Application Booklet |
10/03/95 |
|
62-344 (37K)
|
Delegation
of the Environmental Resource Program to Local
Governments (Forms) |
05/09/00 |
|
62-345
(125K) |
Uniform Wetland Mitigation Assessment Method (Forms) |
04/27/05 |
|
62-346 (131K) |
Environmental Resource Permitting in
Northwest Florida (Forms) |
10/01/07 |
|
62B-49 (39K) |
Joint
Coastal Permits and Concurrent Processing of
Proprietary Authorizations |
02/19/98 |
|
Permitting
Rules (for Northwest District only) |
|
For "Grandfathered" Northwest District
Applications that Qualify under s. 373.4145(6), F.S. |
|
62-25 |
Regulation of Stormwater Discharge |
05/08/85 |
|
62-312 (193K) |
Dredge
and Fill Activities (Forms) |
03/15/07 |
|
For Northwest District
Applications after October 1, 2007 |
|
62-346 (131K) |
ERP
in Northwest Florida (Forms) |
10/01/07 |
|
Guidance Documents Incorporated by
Reference |
|
|
Applicant's Handbook Volume I
(783K)
Procedures and
Environmental Criteria |
10/01/07 |
|
|
Applicant's Handbook Volume II
(3.2M)Engineering
Requirements |
10/01/07 |
|
|
Land Development Manual Chapters 1-5 (12.3M) |
06/1988 |
|
|
Land Development Manual Chapter 6 (13.7M) |
06/1988 |
|
|
Florida
Stormwater, Erosion and Sedimentation Control
Inspector's Manual |
|
|
|
FDOT Standard Specifications for Road and Bridge
Construction |
|
|
|
State of Florida Erosion and Sediment Control Designer
and Reviewer Manual PDF (35.5M) |
06/2007 |
|
Environmental Resource Permitting
in
Florida's Panhandle |
Informational brochure (448kb)
|
|
|
Sovereign Submerged Lands |
|
18-14
(12K) |
Administrative
Fines for Damaging State Lands or Products
Thereof |
07/07/85 |
|
18-18
(33K) |
Biscayne
Bay Aquatic Preserve |
06/05/96 |
|
18-20
(70K) |
Florida
Aquatic Preserves |
08/01/01 |
|
18-21
(149K) |
Sovereign
Submerged Lands Management (Forms) |
01/01/06 |
|
For Projects Located Within The SRWMD |
|
40B-1
(10K)
|
General
and Procedural Rules |
10/03/95 |
|
40B-4
(88K) |
Regulations |
10/03/95 |
|
40B-400
(61K) |
Environmental
Resource Permits |
10/03/95 |
Technical Guidance
(83K)
|
ERP
Applicant’s Handbook |
10/03/95 |
|
Current Agreement
(590K)
|
Operating
Agreement between SRWMD and the DEP |
07/01/07 |
| |
Historical Agreement (20kb)
|
10/27/98 |
|
For Projects Located Within The SJRWMD |
|
40C-1
(7K)
|
Organization
and Procedure |
10/03/95 |
|
40C-4
(72K) |
Environmental
Resource Permits: Surface Water Management
Systems |
10/03/95 |
|
40C-8
(36K) |
Minimum
Flows and Levels |
10/03/95 |
|
40C-40
(11K) |
Standard
General Environmental Resource Permits |
10/03/95 |
|
40C-41
(34K) |
Surface
Water Management Basin Criteria |
10/03/95 |
|
40C-42
(85K) |
Regulation
of Stormwater Management Systems |
10/03/95 |
Basin
Descriptions (29K) |
Legal
Descriptions of Basins |
10/03/95 |
|
Technical Guidance
(220K) |
Applicant's
Handbook:
Regulation of Stormwater Management Systems
Handbook |
10/03/95 |
|
MSSW
Handbook (188K) |
Applicant's
Handbook:
Management of Surface Waters (MSSW) Handbook |
10/03/95 |
|
Current Agreement
(503K) |
Operating
Agreement between SJRWMD and the DEP |
07/01/07 |
|
|
Historical Agreement
(29K) |
10/27/98 |
|
For Projects Located Within The SWFWMD |
|
40D-1
(42K) |
Procedural |
09/04/05 |
|
40D-4 (69K) |
Individual
Environmental Resource Permits |
09/04/05 |
|
40D-8 (1.58mb) |
Water Levels and Rates of Flow |
09/04/05 |
|
40D-40
(13K) |
Standard
General Environmental Resource Permits |
09/04/05 |
|
40D-45 (27K) |
Surface
Water Management for Mining Materials other than
Phosphate
REPEALED |
09/4/05 |
|
Technical Guidance
(2.5 mb) |
Basis
of Review for ERP Applications |
08/02/06 |
|
Part D (432 kb) |
Project Design Aids |
07/1996 |
|
Current Agreement (103K) |
Operating
Agreement between SWFWMD and the DEP |
07/01/07 |
|
Historical Agreement (21K) |
10/27/98 |
|
For Projects Located Within The SFWMD |
|
40E-1
(14K) |
General
and Procedural |
10/03/95 |
|
40E-4
(63K) |
Surface
Water Management |
10/03/95 |
|
40E-40
(17K) |
General
Surface Water Management Permits |
10/03/95 |
|
40E-41
(4K) |
Surface
Water Management Basin and Related Criteria |
10/03/95 |
|
Technical Guidance
(268K) |
Basis
of Review for ERP Applications |
10/03/95 |
|
Appendix
2 |
|
|
Appendix
3 |
|
|
Appendix
6 |
|
Current Agreement
(398K) |
Operating
Agreement between SFWMD and the DEP |
07/01/07 |
| |
Historical Agreement
(22K) |
10/27/98 |